Estimating construction costs and schedules: Experience with

By: Bacon, Robert WContributor(s): Heidarian, Jamshid | Besant-Jones, John EMaterial type: TextTextSeries: World Bank technical paperPublisher: Washington,World Bank,1996Description: xv; 120p;pbkISBN: 0-8213-3670-3Subject(s): Electric power plants-Developing countries-Costs-Statistics | Electric power plants-Design and construction-Estimates-Developing countries | Engineering | TechnologyDDC classification: 621.3121/BAC
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
Books Books IGIDR
621.3121/BAC (Browse shelf) Available 23654


For any Suggestions or Query, please contact the library staff @ lib@igidr.ac.in or Phone: 022-69096504/69096563

Powered by Koha